At least 20 floods in 13 years, after nearly three decades with none. That was the history of a cottage driveway in Wrenbury, near Nantwich, and it ended with a £42,500 award against the highway authority. On appeal the High Court upheld every pound. Yet the most striking part of the judgment, for anyone who prepares or relies on expert evidence, is that the chartered surveyor's valuation report was used without CPR 35 permission ever being sought [1].
Key Takeaways
- The High Court dismissed Cheshire East Council's appeal in its entirety. The £42,500 award stands.
- £25,000 of the award was for loss in value of the property, one third of the £75,000 claimed.
- No permission had been given under CPR 35 for the claimants' surveyor's valuation report. It survived only because the Council never objected before or at trial.
- The trial judge gave the report little, if any, weight because it was out of date and had many defects.
The Facts
Colin Eaton and Barbara Thorneycroft own and live at The Cottage, The Green, Wrenbury, in Cheshire. The Green is a public highway and Cheshire East Council is the highway authority.
Between 1983 and 2012 the property did not flood. From about 2012 to late 2024, water running off the highway flooded the front driveway and garden again and again. The house itself was not flooded.
The highway drain had 7 gullies, and at one point the pipe narrowed from 150mm to 100mm. Over the years the Council carried out one CCTV survey and two jettings. The jetting in November 2024 finally worked. The Council pointed to the scale of its task: it is responsible for 104,000 gullies.
The owners sued in private nuisance. After a three-day trial in September 2025 at the County Court at Chester, Mr Recorder Shaw awarded:
All the special damage claims were rejected. The Council appealed on both liability and the amount. Mr Justice Mansfield heard the appeal on 26 June 2026 and handed down judgment on 22 September 2026 [1].
The Expert Evidence
Drainage experts
Both sides relied on written drainage evidence, including a joint report. The experts agreed on the essentials:
- The reduction in pipe diameter was unusual and could restrict flow, but it was not the single cause.
- Tree roots or debris were a likely contributing factor.
- The jetting was likely to have cleared the roots.
The appeal judge noted: "I do not understand there to be any issue as to the Judge's treatment of the expert drainage evidence." Agreed, reasoned expert evidence left little room for argument.
The surveyor's valuation report
The loss in value was a different story. The claimants put in a report from Mr Spencer, a chartered surveyor. No one had asked the court for permission to rely on it as expert evidence, and Mr Spencer was not cross-examined. The trial judge considered the report significantly out of date and acknowledged its many defects.
On appeal the Council said the report should never have been admitted. Mansfield J agreed with part of that:
"I agree with the Defendant's criticism that no permission had been given to rely on Mr Spencer as an expert pursuant to CPR 35."
But the Council had not objected before or at the trial. It was too late to raise the point on appeal, and the trial judge had made no error in failing to exclude the report of his own motion. In any event, "the Judge attached little, if any, weight to Mr Spencer's evidence".
So how did the claimants still recover £25,000? Because the flooding history was something that would have to be disclosed to a buyer, and the trial judge was entitled to find some loss in value on the evidence as a whole. As the appeal judge put it:
"He was not obliged to reject the claim out of hand as being unsupported by evidence."
The Council also complained that the trial judge had visited the site alone. On the facts, that was held not to be unfair.
Expert Evidence, CPR 35 and the Surveyor Valuation Report: Five Lessons
- Get permission. Under CPR Part 35 no party may rely on expert evidence without the court's permission. A surveyor's valuation report is expert evidence. These claimants were fortunate that no one objected.
- Object at the right time. A party faced with an expert report that has no permission must say so before or at trial. Silence is likely to be fatal on appeal.
- Keep the report current and robust. An out-of-date report with defects earned little weight, and the claimants recovered one third of the diminution they claimed.
- Flooding history affects value even after the fix. A history that must be disclosed on sale can support an award for blight, even when the drainage problem has been solved.
- Keep records. Dated complaints, photographs and correspondence over many years were the foundation of the finding that the Council knew of the problem and did not deal with it.
Preparing a Diminution in Value Report That Complies With Part 35
For chartered surveyors asked to value the effect of flooding, subsidence, defects or a neighbour's nuisance, the general principles are well known but easily neglected:
- Check that permission has been or will be sought. Ask the instructing solicitor before starting work.
- Value at the right date, and update. A report prepared early in a dispute may need to be refreshed before trial.
- Show the comparables and the reasoning. A bare percentage deduction is easy to attack.
- Value with and without the problem. The court needs to see both figures and how the difference is reached.
- Include the expert's declaration and statement of truth, and set out the instructions received.
- Be ready to be questioned. Evidence that has not been tested by questions or cross-examination may carry less weight.
For homeowners in Manchester, Cheshire and across the North West, the message is that the quality of the surveyor's report can decide how much of a claim is recovered.
Frequently Asked Questions
Can a homeowner claim for loss in value after repeated flooding from a highway?
In this case the owners succeeded in private nuisance against the highway authority and recovered £25,000 for diminution in value, plus damages for loss of amenity.
Is a surveyor's valuation report automatically admissible?
No. Expert evidence needs the court's permission under CPR 35. In Eaton the report was considered only because the other side did not object in time.
Why was the award lower than the sum claimed?
The claim was for £75,000. The trial judge gave little, if any, weight to the valuation report and awarded £25,000 on the evidence as a whole.
Does a flooding problem still affect value once it is fixed?
It can. The history would have to be disclosed on a sale, and that supported the award here.
Conclusion
Eaton v Cheshire East Council is a win for persistent homeowners, and a warning to everyone else. Agreed drainage evidence settled the cause of the flooding. A weak, unpermitted valuation report nearly undermined the claim for loss in value and cut the recovery to a third. Anyone bringing or defending a property damage claim should instruct an independent surveyor early, obtain the court's permission for the evidence, and keep the report up to date.
This article is general information and is not legal advice. Advice should be taken on the facts of any individual case.