{"cover":"Professional landscape format (1536×1024) hero image featuring bold text overlay 'Building Surveys for Office Retrofit Opportunities: Uncovering Value in London's Underpriced Recovery Market' in extra large 70pt white sans-serif font with dark gradient shadow, positioned in upper third. Background shows split composition: left side displays London skyline with iconic office buildings and The Gherkin, right side shows detailed architectural survey equipment, thermal imaging camera, and building plans overlaid on vintage London office facade. Color scheme: deep navy blue, gold accents, white text. Professional surveyor in high-visibility vest examining building structure visible in middle ground. Magazine cover quality, editorial style, high contrast for maximum text readability, sophisticated business aesthetic with urban London atmosphere.","content":["Landscape format (1536×1024) detailed illustration showing comprehensive building survey process in London office building. Central focus on RICS chartered surveyor conducting Level 3 building survey with tablet and laser measuring device. Split-screen composition showing thermal imaging overlay revealing heat loss patterns, structural defects highlighted with red annotation markers, moisture detection readings on walls. Background features cross-section cutaway of multi-story London office building revealing hidden defects: outdated HVAC systems, poor insulation, aging electrical infrastructure. Foreground displays survey checklist on clipboard with categories: structural integrity, building envelope, mechanical systems, energy efficiency ratings. Color palette: professional blues, warning oranges for defects, technical greens. Infographic-style annotations pointing to specific survey areas. Clean, technical aesthetic with London architectural elements visible through windows.","Landscape format (1536×1024) comprehensive infographic displaying London commercial property market data and retrofit opportunity analysis. Central element: detailed map of London divided into regions (West London, South East London, North West London, South West London) with color-coded heat map showing underpriced office assets and retrofit potential scores. Left panel features bar chart comparing traditional redevelopment costs versus retrofit costs with 40-60% savings highlighted. Right panel shows pie chart of building defects commonly found in London office stock: 35% energy inefficiency, 25% structural issues, 20% outdated systems, 15% envelope failures, 5% other. Bottom section displays timeline graphic of RE:FIT5 framework 2026-2030 with key milestones and £260 million investment figures. Professional color scheme: corporate blues, gold highlights, data visualization greens and reds. Clean modern design with statistical overlays and percentage callouts.","Landscape format (1536×1024) before-and-after comparison showcasing successful London office retrofit transformation. Left half labeled 'Before Survey': dated 1980s office building exterior with visible deterioration, single-pane windows, poor insulation indicators, outdated facade, energy performance certificate showing low rating. Right half labeled 'After Retrofit': same building transformed with modern glazing, improved building envelope, solar panels on roof, green wall features, upgraded entrance, energy performance certificate showing 65% improvement. Center dividing line features vertical survey report document with key findings and retrofit recommendations. Top overlay shows cost analysis: investment required, energy savings projections, ROI timeline, carbon reduction metrics (40% reduction highlighted). Bottom strip displays detailed technical improvements: HVAC upgrades, insulation specifications, glazing improvements, renewable energy integration. Professional architectural photography style with technical annotation overlays, measurement callouts, and performance data visualization. London cityscape visible in background. Color scheme: contrasting warm tones for before, cool modern tones for after, professional survey document styling."]"}

London's commercial property landscape stands at a critical crossroads in 2026. While office buildings represent the most underpriced asset class in the current market, many investors and property owners overlook the hidden value waiting to be unlocked through strategic retrofits. Building Surveys for Office Retrofit Opportunities: Uncovering Value in London's Underpriced Recovery Market has emerged as a crucial strategy for identifying defects, assessing retrofit potential, and capitalizing on what industry experts are calling the opportunity of the decade.
The convergence of several factors makes this moment unique. Buildings account for approximately 40 percent of the UK's total carbon footprint, creating urgent pressure for retrofit action.[2] Meanwhile, London's aging office stock—much of it outdated and increasingly unfit for purpose—presents both a challenge and an opportunity.[4] For surveyors and property professionals who know what to look for, comprehensive building surveys can reveal substantial value in properties that others might dismiss.
Key Takeaways
- 🏢 Office buildings are currently the most underpriced asset class in London's commercial property market, creating significant retrofit opportunities for informed investors
- 🔍 Comprehensive building surveys are essential for identifying hidden defects and assessing retrofit potential before making investment decisions
- 💰 Retrofits deliver faster ROI than full redevelopment, with more manageable costs and proven energy savings of up to 65% in operational demand
- 📊 The RE:FIT5 framework (2026-2030) provides a performance-based model that has already delivered over £260 million in energy-saving investments
- 🎯 Regional London variations require specialized survey approaches tailored to each area's unique building stock and market conditions
Understanding the London Office Market Recovery in 2026

Why Office Buildings Are Underpriced
The London office market has experienced significant shifts following the pandemic-era disruptions and the subsequent evolution of workplace patterns. However, contrary to pessimistic predictions, offices have not become obsolete. Instead, they've transformed into what many analysts consider an undervalued opportunity waiting for strategic intervention.[6]
Several factors contribute to this underpricing:
- Outdated perceptions about remote work reducing office demand permanently
- Lack of understanding about retrofit potential versus demolition and rebuild
- Information gaps regarding actual building condition and improvement costs
- Uncertainty about energy performance standards and compliance requirements
The reality is that refurbishments and retrofits will be faster to deliver than full redevelopment with more manageable costs.[6] This creates a window of opportunity for investors who can accurately assess building conditions through proper surveys.
The Role of Building Surveys in Value Discovery
A thorough RICS commercial building survey serves as the foundation for identifying retrofit opportunities. Unlike basic valuations, comprehensive surveys reveal:
Critical defect categories:
- Structural integrity issues
- Building envelope failures
- Mechanical and electrical system obsolescence
- Energy efficiency deficiencies
- Compliance gaps with current regulations
These findings directly inform retrofit strategies and investment decisions. Without proper survey data, investors risk underestimating costs or missing opportunities entirely.
Building Surveys for Office Retrofit Opportunities: Essential Survey Types and Methodologies
Level 3 Building Surveys for Comprehensive Assessment
When evaluating potential retrofit opportunities, a Level 3 building survey provides the most detailed analysis. This comprehensive inspection examines every accessible part of the property, making it ideal for:
- Older office buildings (typically pre-1990s construction)
- Properties with visible defects or known issues
- Buildings requiring significant modernization
- Investment properties where accurate cost projections are critical
The Level 3 survey delivers detailed information about construction, materials, defects, and repair recommendations—all essential for planning retrofit work.
Specialized Survey Types for Retrofit Planning
Beyond general building surveys, several specialized assessments provide crucial data for retrofit projects:
Stock Condition Surveys
A stock condition survey evaluates the current state of building components and projects future maintenance needs. For office retrofits, this survey type helps:
- Prioritize improvement works
- Develop phased retrofit programs
- Budget for long-term maintenance
- Identify components nearing end of life
Specific Defect Surveys
When preliminary assessments reveal particular concerns, a specific defect survey provides focused investigation. Common defects in London office buildings include:
- Concrete carbonation in post-war structures
- Cladding failures requiring replacement
- Roof membrane deterioration causing water ingress
- Window seal failures compromising thermal performance
Thermal Imaging and Energy Assessments
Modern survey technology enables non-invasive evaluation of energy performance. Thermal imaging reveals:
- Heat loss through building envelope
- Air leakage points
- Insulation deficiencies
- HVAC system inefficiencies
This data directly informs energy retrofit strategies and helps project potential savings.
Survey Methodologies for Accurate Retrofit Assessment
Effective surveys for retrofit opportunities require systematic approaches:
1. Desktop Research Phase
- Review historical building records
- Analyze previous survey reports
- Check planning and building control history
- Research original construction methods
2. Site Investigation Phase
- Visual inspection of all accessible areas
- Non-destructive testing where appropriate
- Photographic documentation
- Measurement and verification
3. Analysis and Reporting Phase
- Defect categorization by urgency
- Cost estimation for remedial works
- Retrofit opportunity identification
- Compliance gap analysis
Identifying High-Value Retrofit Opportunities Through Building Surveys
Key Defects That Signal Retrofit Potential
Experienced surveyors recognize certain defect patterns that indicate strong retrofit candidates rather than properties to avoid. These include:
Building Envelope Issues:
- Single-glazed or early double-glazed windows (easy upgrade path)
- Poor or absent cavity wall insulation
- Flat roof systems approaching replacement cycle
- Outdated curtain walling systems
Mechanical and Electrical Systems:
- Aging HVAC systems with low efficiency ratings
- Oversized heating/cooling equipment (opportunity for right-sizing)
- Absence of building management systems
- Outdated lighting (LED conversion potential)
Structural Elements:
- Sound primary structure with cosmetic issues
- Good floor-to-ceiling heights (retrofit flexibility)
- Adequate floor loading for modern office use
- Accessible service runs and risers
Case Study: WSP London Office Retrofit Success
The WSP London office retrofit demonstrates the transformative potential that building surveys help unlock. This project achieved a remarkable 65% reduction in operational energy demand and uses outside air for free cooling approximately 80% of the year.[1]
Key factors identified during initial surveys that enabled this success:
✅ Strong structural framework supporting modifications
✅ Suitable building orientation for natural ventilation
✅ Adequate ceiling heights for improved air distribution
✅ Roof structure capable of supporting additional equipment
This case illustrates how comprehensive surveys identify both obstacles and opportunities, enabling informed retrofit decisions.
Regional London Considerations for Building Surveys
Different London regions present unique characteristics that affect retrofit opportunities:
West London Office Stock
West London features a mix of Victorian conversions and mid-century office blocks. Survey priorities include:
- Heritage considerations for listed buildings
- Structural capacity of converted residential properties
- Planning constraints in conservation areas
- Ground conditions in Thames-adjacent areas
South East London Opportunities
The South East London market includes significant 1960s-1980s office stock with high retrofit potential. Common survey findings:
- Concrete frame structures in good condition
- Outdated cladding systems requiring replacement
- Oversized plant rooms (opportunity for space reconfiguration)
- Good transport links supporting office use
North West London Commercial Areas
North West London offers diverse office typologies. Survey considerations include:
- Mixed-use building complexities
- Varied construction quality requiring careful assessment
- Parking and access considerations for retrofit logistics
- Local authority requirements for energy improvements
South West London Premium Market
South West London commands premium rents, justifying higher retrofit investments. Survey focus areas:
- Higher specification expectations
- Integration with surrounding residential areas
- Premium finishes and systems
- Enhanced sustainability credentials
Building Surveys for Office Retrofit Opportunities: Financial Analysis and ROI Modeling
Cost-Benefit Analysis Based on Survey Findings
Accurate survey data enables realistic financial modeling. The typical retrofit investment breakdown includes:
| Cost Category | Percentage of Total | Survey Data Required |
|---|---|---|
| Building Envelope | 25-35% | Facade condition, window performance, insulation gaps |
| Mechanical Systems | 30-40% | HVAC age, efficiency ratings, capacity assessment |
| Electrical Systems | 15-20% | Distribution condition, lighting, controls |
| Interior Improvements | 10-15% | Layout efficiency, finishes condition |
| Professional Fees | 10-15% | Complexity assessment, compliance requirements |
The RE:FIT5 Framework and Performance Contracting
The Mayor of London is launching RE:FIT5 (2026–2030) in March 2026, an improved national framework designed to help public sector organizations decarbonize their buildings efficiently and affordably.[2] This program offers valuable lessons for private sector retrofits.
Key RE:FIT5 principles applicable to commercial retrofits:
🔹 Performance guarantees – Energy service companies guarantee specified levels of energy performance
🔹 Future income streams – Energy savings fund improvement costs
🔹 Risk transfer – Contractors bear performance risk
🔹 Proven track record – Over £260 million worth of investment projects delivered[2]
Building surveys provide the baseline data necessary to structure similar performance-based contracts in the private sector.
Calculating Retrofit ROI
Survey findings enable accurate ROI calculations:
Energy Savings Calculation:
Annual Energy Cost Savings =
(Current Energy Use - Projected Post-Retrofit Use) × Energy Rate
Simple Payback Period:
Payback Period = Total Retrofit Investment ÷ Annual Energy Cost Savings
Enhanced Value Calculation:
Property Value Increase =
Improved EPC Rating Value Premium + Reduced Operating Costs Capitalization
Realistic examples based on London office retrofits:
- Scenario 1: £2M retrofit investment, £300K annual energy savings = 6.7-year payback
- Scenario 2: £5M comprehensive retrofit, 65% energy reduction, 20% rental premium = 8-year payback with significant value uplift
Funding and Financing Retrofit Projects
Survey reports support various financing approaches:
Traditional Financing:
- Bank loans secured against improved asset value
- Developer equity based on projected returns
- Joint venture structures sharing risk and reward
Green Financing:
- Green bonds linked to environmental performance
- Sustainability-linked loans with rate reductions
- Energy performance contracts (RE:FIT model)
Grant and Incentive Programs:
- Public sector decarbonization schemes
- Local authority improvement grants
- Tax incentives for energy efficiency
Detailed building survey reports provide the documentation lenders require to assess retrofit proposals.
Overcoming Common Challenges in Office Retrofit Projects

Survey-Identified Obstacles and Solutions
Comprehensive surveys reveal potential obstacles before they become costly surprises:
Challenge 1: Asbestos and Hazardous Materials
Many London office buildings constructed before 2000 contain asbestos. Survey identification enables:
- Accurate removal cost estimation
- Phasing strategies to minimize disruption
- Compliance with Control of Asbestos Regulations
- Worker and occupant safety planning
Challenge 2: Structural Limitations
Surveys assess whether existing structures can support retrofit modifications:
- Additional equipment loads on roofs
- New facade systems
- Floor loading for increased occupancy
- Service penetrations through structural elements
When limitations exist, structural engineering assessments provide strengthening solutions.
Challenge 3: Building Occupancy During Works
Surveys inform phasing strategies that minimize business disruption:
- Floor-by-floor retrofit programs
- Out-of-hours work scheduling
- Temporary relocation requirements
- Access and logistics planning
Challenge 4: Planning and Regulatory Approvals
Survey findings help navigate approval processes:
- Listed building consent requirements
- Conservation area considerations
- Building regulation compliance paths
- Energy performance standards
Managing Dilapidations and Lease Considerations
For leasehold office properties, retrofit planning intersects with dilapidations obligations. A schedule of dilapidations identifies:
- Landlord versus tenant responsibilities
- End-of-lease repair obligations
- Opportunities to align retrofits with dilapidations works
- Negotiation points for lease variations
Understanding these obligations through proper surveys prevents conflicts and enables collaborative retrofit approaches.
Technology Integration in Modern Surveys
Advanced survey technologies enhance retrofit planning:
Drone Surveys:
Drone surveys provide safe, cost-effective roof and facade inspection, particularly valuable for:
- High-rise office buildings
- Buildings with access challenges
- Large roof areas requiring assessment
- Facade condition surveys
3D Laser Scanning:
Creates detailed building models supporting:
- Accurate measurement for retrofit design
- Clash detection before construction
- As-built documentation
- Virtual planning and coordination
Building Information Modeling (BIM):
Survey data integrated into BIM enables:
- Collaborative design development
- Lifecycle cost analysis
- Facilities management planning
- Future modification planning
Industry Trends Shaping Office Retrofit Opportunities in 2026
The Standardization Movement
Industry leaders are advocating for standardized definitions, open datasets, and trusted energy-performance baselines to make retrofit decisions faster and more consistent for investors and lenders.[4] This standardization movement affects building surveys by:
- Establishing common defect classification systems
- Creating benchmarking databases for retrofit costs
- Developing standardized reporting formats
- Enabling data-driven investment decisions
Surveyors who adopt these emerging standards position themselves as preferred partners for institutional investors.
Skills and Workforce Development
The retrofit sector faces workforce challenges heading into 2026. The industry requires surveyors with:
✓ Traditional building pathology expertise
✓ Energy assessment capabilities
✓ Modern technology proficiency
✓ Sustainability knowledge
✓ Project management skills
Continuous professional development ensures surveyors can identify and evaluate retrofit opportunities effectively.
ESG and Net Zero Drivers
Environmental, Social, and Governance (ESG) considerations increasingly drive retrofit decisions. Building surveys now assess:
- Carbon reduction potential – Embodied versus operational carbon
- Circular economy opportunities – Material reuse and recycling
- Social value – Employment, community benefits, health and wellbeing
- Governance – Compliance, reporting, transparency
These factors influence investment decisions beyond simple financial returns.
The Shift Toward Retrofit-First Strategies
The commercial property industry is embracing retrofit-first approaches rather than demolition and rebuild. This shift reflects:
- Embodied carbon concerns – Existing buildings represent significant embodied carbon
- Speed to market – Retrofits deliver faster than new construction[6]
- Cost predictability – Better-defined scope compared to ground-up development
- Operational continuity – Phased retrofits maintain building income
Building surveys enable this strategic shift by providing the data necessary for confident retrofit decisions.
Practical Steps for Implementing Building Survey-Based Retrofit Strategies
Step 1: Portfolio Screening and Opportunity Identification
For investors with multiple properties:
- Conduct preliminary assessments of all office assets
- Rank properties by retrofit potential based on:
- Current condition and defects
- Energy performance gaps
- Market position and rental potential
- Regulatory compliance requirements
- Prioritize detailed surveys for highest-potential properties
- Develop phased programs across portfolio
Step 2: Commissioning Comprehensive Building Surveys
Select appropriate survey types based on initial screening:
- Level 3 surveys for comprehensive retrofit candidates
- Specific defect surveys for targeted issues
- Energy assessments for all properties
- Specialist surveys (structural, M&E, etc.) as needed
Engage RICS-certified surveyors with commercial retrofit experience.
Step 3: Developing Retrofit Strategies from Survey Data
Transform survey findings into actionable strategies:
Immediate Actions (0-6 months):
- Address urgent defects affecting building operation
- Implement quick-win energy improvements
- Develop detailed retrofit designs
- Secure necessary approvals
Medium-Term Actions (6-18 months):
- Execute major building envelope improvements
- Upgrade mechanical and electrical systems
- Implement building management systems
- Complete interior modernization
Long-Term Actions (18+ months):
- Monitor and optimize performance
- Implement continuous improvement
- Plan next-phase enhancements
- Update surveys and documentation
Step 4: Procurement and Project Delivery
Use survey data to support procurement:
- Detailed specifications based on survey findings
- Accurate cost estimates reducing tender variations
- Risk allocation informed by known conditions
- Performance requirements with measurable targets
Consider performance-based contracting models similar to RE:FIT5 where contractors guarantee outcomes.
Step 5: Post-Retrofit Monitoring and Verification
Ensure projected benefits materialize through:
- Commissioning of all new systems
- Performance monitoring against survey-based baselines
- Energy consumption tracking validating savings
- Occupant satisfaction surveys
- Follow-up surveys documenting improvements
Monitoring surveys can track building performance over time and identify optimization opportunities.
Building Surveys for Office Retrofit Opportunities: Regional Market Intelligence
West London: Heritage and Innovation
West London's office market combines historic buildings with modern developments. Survey considerations include:
Typical Building Types:
- Victorian and Edwardian conversions
- 1960s-1970s office blocks
- Modern developments (post-2000)
Common Retrofit Opportunities:
- Window replacement in heritage-sensitive designs
- Insulation improvements within planning constraints
- Modern services in period buildings
- Accessibility upgrades
Market Dynamics:
- Premium rental potential justifying higher retrofit investment
- Strong occupier demand for characterful space
- Planning complexity requiring specialist advice
South East London: Regeneration and Value
South East London offers significant value opportunities:
Typical Building Types:
- Post-war office estates
- Industrial conversions
- Mixed-use developments
Common Retrofit Opportunities:
- Cladding replacement programs
- Complete M&E system upgrades
- Space reconfiguration for modern work patterns
- Public realm improvements
Market Dynamics:
- Improving transport infrastructure supporting values
- Lower entry costs enabling comprehensive retrofits
- Growing occupier interest in regeneration areas
North West London: Diverse and Dynamic
North West London's varied office stock requires flexible approaches:
Typical Building Types:
- Suburban office parks
- Town center commercial buildings
- Converted industrial premises
Common Retrofit Opportunities:
- Energy efficiency improvements
- Parking and EV charging infrastructure
- Amenity upgrades
- Flexible workspace conversions
Market Dynamics:
- Competitive rental market requiring differentiation
- Mixed occupier base from local SMEs to corporate users
- Planning policies supporting employment uses
South West London: Premium and Sustainable
South West London commands premium positioning:
Typical Building Types:
- High-specification office buildings
- Professional services headquarters
- Modern business parks
Common Retrofit Opportunities:
- Enhanced sustainability credentials
- Wellness and amenity features
- Technology infrastructure upgrades
- Premium finishes and services
Market Dynamics:
- Occupiers willing to pay premium for quality and sustainability
- Strong competition requiring differentiation
- High expectations for building performance
The Future of Building Surveys in London's Office Retrofit Market

Emerging Technologies and Methodologies
The survey profession continues evolving:
Artificial Intelligence and Machine Learning:
- Automated defect detection from images
- Predictive maintenance algorithms
- Cost estimation models
- Energy performance prediction
Internet of Things (IoT) Integration:
- Continuous building monitoring
- Real-time performance data
- Predictive defect identification
- Optimization recommendations
Digital Twin Technology:
- Virtual building replicas
- Scenario modeling
- Lifecycle planning
- Performance optimization
Policy and Regulatory Evolution
Anticipated regulatory changes affecting retrofits:
- Stricter EPC requirements for commercial lettings
- Embodied carbon reporting requirements
- Circular economy material reuse mandates
- Net zero pathways for existing buildings
Building surveys will increasingly assess compliance with evolving standards.
Market Outlook for Office Retrofit Opportunities
The outlook for London office retrofits remains strong:
Demand Drivers:
- Flight to quality from outdated stock
- ESG requirements from occupiers and investors
- Regulatory compliance pressures
- Energy cost concerns
Supply Factors:
- Large stock of retrofit candidates
- Limited new development pipeline
- Underpricing creating opportunity
- Proven retrofit success cases
Investment Trends:
- Increasing capital allocation to retrofits
- Specialist retrofit funds emerging
- Institutional interest growing
- Performance-based financing expanding
Conclusion: Capitalizing on London's Office Retrofit Opportunity
Building Surveys for Office Retrofit Opportunities: Uncovering Value in London's Underpriced Recovery Market represents more than a technical process—it's a strategic approach to identifying and capturing significant value in one of London's most promising investment sectors.
The convergence of underpriced office assets, urgent decarbonization requirements, proven retrofit success stories, and supportive frameworks like RE:FIT5 creates an exceptional opportunity window in 2026. However, success requires moving beyond superficial assessments to comprehensive building surveys that reveal true retrofit potential.
Key success factors include:
✅ Engaging qualified surveyors with commercial retrofit expertise
✅ Conducting comprehensive assessments using appropriate survey types
✅ Leveraging modern technology for accurate data collection
✅ Understanding regional market dynamics across London
✅ Developing realistic financial models based on survey findings
✅ Implementing proven retrofit strategies informed by case studies
✅ Monitoring performance to validate projected benefits
Actionable Next Steps
For property investors, owners, and developers looking to capitalize on office retrofit opportunities:
1. Assess Your Current Position
- Review existing office holdings for retrofit potential
- Identify properties with strong fundamentals but performance gaps
- Consider acquisition opportunities in underpriced segments
2. Commission Professional Surveys
- Engage experienced chartered surveyors for comprehensive assessments
- Request detailed retrofit opportunity analysis
- Obtain accurate cost projections and ROI modeling
3. Develop Strategic Plans
- Prioritize properties by retrofit potential and market position
- Create phased implementation programs
- Secure necessary financing and approvals
4. Execute with Excellence
- Select experienced retrofit contractors
- Implement robust project management
- Monitor performance against projections
5. Optimize and Scale
- Learn from initial projects
- Refine strategies based on results
- Expand successful approaches across portfolio
The London office retrofit opportunity is real, substantial, and time-sensitive. Those who act decisively with proper survey-based intelligence will capture value that others overlook. The building stock exists, the technology works, the financing is available, and the market is underpriced. The question is not whether office retrofits make sense—it's who will move first to secure the best opportunities.
In a market where buildings account for 40% of carbon emissions and office assets remain undervalued, comprehensive building surveys provide the foundation for transforming challenges into opportunities. The time to act is now, and the path forward begins with understanding exactly what you're working with through professional, detailed building surveys.
References
[1] London Office Sustainable Retrofit – https://www.wsp.com/en-us/projects/london-office-sustainable-retrofit
[3] London Commercial Property Market – https://removalsandstoragex.com/blog/london-commercial-property-market/
[4] Retrofit At Scale Investible Urban Development – https://www.gensler.com/blog/retrofit-at-scale-investible-urban-development
[5] Are Retrofit Skills And Workforce Growth On Track Heading Into 2026 – https://elementallondon.show/features/are-retrofit-skills-and-workforce-growth-on-track-heading-into-2026/
[6] The Shifting Landscape Of Uk Offices – https://www.jll.com/en-uk/insights/the-shifting-landscape-of-uk-offices













